October of 2016 we put up half of the 2×6 part of the roof/ceiling. That wasn’t enough. I had to leave so I gave the instructions to my team there to finish the 2×6 asap. Well…it started to rain and didn’t stop for several months. Things got wet and worse than that got moldy. Finally the 2×6 roof was done and a blue roof was installed. The summer of 2017 I hired a company to install the real roof. 8″ of insulation and metal roof was installed. WhooHoo!! Finally!! It is now a wonderful roof keeping both the cold and the heat out and maintaining a wonderful temperature inside the log cabin.